Hàn Giang Building — A Glazed Ceramic Façade on the Hàn River
Back to Projects/03 · Architectural Façades

1,150 m² of high-fired glazed ceramic wrapping a 12-storey office building, shifting with river light from morning to dusk.

Illustrative image

Scope
Material advice, panel fabrication & exterior supervision
Architect / Partner
Nhịp Cầu Architects for Hàn Giang Capital
Material
Glazed ceramic fired above 1,200°C, C2TE-S1 exterior adhesive
Location
Da Nang · 2025

Hàn Giang Capital · Da Nang · 2025 · 1,150 m² · 1,840,000 ceramic tesserae

CONCEPT & CHALLENGE

Material thinking for real architecture

The Hàn Giang Building faces the Hàn River, its main elevation taking the full afternoon sun from the west. The architects wanted a skin that would not fade like paint or feel cold like glass. We proposed high-fired Bát Tràng glaze in fields that rise from navy at street level to sky blue at the roof. Seen from the Dragon Bridge, the building reads like water standing upright.

Technical challenge

The west face reaches 60°C on summer afternoons, causing large thermal movement. Panels had to be fixed from scaffolding while colour clusters still flowed across every floor.

Fabrication & site protocol

  • Three 60 × 60 cm mock-ups hung on a nearby roof for 30 days before the glaze was signed off.
  • Sheet drawings align with structural expansion joints, one horizontal joint per floor.
  • Every sheet is coded by floor, grid line and order, then sent up the scaffold shift by shift.
  • Smoke-grey grout keeps the joints soft from a distance instead of a white grid.
  • Result: after the 2025 storm season, not one piece has lifted and the glaze is unchanged.
ARCHITECTURAL PLATES01 — 03
/01North gable: a single-colour mosaic mural running the full height of the building. — Illustrative image
/02Checking the adhesive bed before grouting. Every piece must be fully bedded. — Illustrative image
/03Cluster density study for a large elevation.

Year

2025

Area

1,150 m²

Tesserae

1,840,000

Location

Da Nang

Approach

A gradient that rises like a water line, expansion joints matched floor by floor, and smoke-grey grout so the façade reads as one surface.

Result

92% leased within six months. The façade has become a landmark on the Hàn's east bank.

Palette

Plinth navy

#0B1270

Hàn River cobalt

#1B2BFF

Dusk blue

#3A63C9

Roofline sky

#00BDF2

Crackle white

#F2F4F7

“Tenants ask for the blue building by the river. They never need the address.”
Anh Hoàng Long — Investment Director, Hàn Giang Capital
“The mock-ups hung outside for 30 days. We chose the glaze after seeing it through real rain and sun.”
Chị Mai Phương — Architect, Nhịp Cầu Architects

Specifications

Scope
West elevation, north gable, entrance
Surface area
1,150 m²
Tesserae
≈ 1,840,000
Tessera size
25 × 25 mm on fibreglass mesh
Bonding system
C2TE-S1, smoke-grey polymer cement grout
Duration
28 weeks

Timeline

  1. 01Mock-ups & weather test5 weeks
  2. 02Sheet drawings3 weeks
  3. 03Workshop fabrication10 weeks
  4. 04Laying from scaffold8 weeks
  5. 05Cleaning & handover2 weeks

Team

  • 1 materials engineer
  • 1 colour designer
  • 14 workshop cutters
  • 16 façade tilers
  • 2 safety supervisors