1,150 m² of high-fired glazed ceramic wrapping a 12-storey office building, shifting with river light from morning to dusk.
Illustrative image
- Scope
- Material advice, panel fabrication & exterior supervision
- Architect / Partner
- Nhịp Cầu Architects for Hàn Giang Capital
- Material
- Glazed ceramic fired above 1,200°C, C2TE-S1 exterior adhesive
- Location
- Da Nang · 2025
Hàn Giang Capital · Da Nang · 2025 · 1,150 m² · 1,840,000 ceramic tesserae
Material thinking for real architecture
The Hàn Giang Building faces the Hàn River, its main elevation taking the full afternoon sun from the west. The architects wanted a skin that would not fade like paint or feel cold like glass. We proposed high-fired Bát Tràng glaze in fields that rise from navy at street level to sky blue at the roof. Seen from the Dragon Bridge, the building reads like water standing upright.
Technical challenge
The west face reaches 60°C on summer afternoons, causing large thermal movement. Panels had to be fixed from scaffolding while colour clusters still flowed across every floor.
Fabrication & site protocol
- Three 60 × 60 cm mock-ups hung on a nearby roof for 30 days before the glaze was signed off.
- Sheet drawings align with structural expansion joints, one horizontal joint per floor.
- Every sheet is coded by floor, grid line and order, then sent up the scaffold shift by shift.
- Smoke-grey grout keeps the joints soft from a distance instead of a white grid.
- Result: after the 2025 storm season, not one piece has lifted and the glaze is unchanged.
Year
2025
Area
1,150 m²
Tesserae
1,840,000
Location
Da Nang
Approach
A gradient that rises like a water line, expansion joints matched floor by floor, and smoke-grey grout so the façade reads as one surface.
Result
92% leased within six months. The façade has become a landmark on the Hàn's east bank.
Palette
Plinth navy
#0B1270
Hàn River cobalt
#1B2BFF
Dusk blue
#3A63C9
Roofline sky
#00BDF2
Crackle white
#F2F4F7
“Tenants ask for the blue building by the river. They never need the address.”
“The mock-ups hung outside for 30 days. We chose the glaze after seeing it through real rain and sun.”
Specifications
- Scope
- West elevation, north gable, entrance
- Surface area
- 1,150 m²
- Tesserae
- ≈ 1,840,000
- Tessera size
- 25 × 25 mm on fibreglass mesh
- Bonding system
- C2TE-S1, smoke-grey polymer cement grout
- Duration
- 28 weeks
Timeline
- 01Mock-ups & weather test5 weeks
- 02Sheet drawings3 weeks
- 03Workshop fabrication10 weeks
- 04Laying from scaffold8 weeks
- 05Cleaning & handover2 weeks
Team
- 1 materials engineer
- 1 colour designer
- 14 workshop cutters
- 16 façade tilers
- 2 safety supervisors
Planning a similar architectural space?
Share your surface area, environment, and target schedule to receive glazed sample boards and technical guidance.